Cargo tanker Pacific Piper operated by PACC required sections of the cargo bottom plating coating to be repaired. A very demanding and difficult job with a very limited timeframe due to the busy schedule of the vessel. The repair was completed with the use of Steelpaint which can cure fast and in high humidity. Job was completed in 72 hours with day and night work.