With use of special lightweight epoxy concrete the uneven parts of the deck were filled up to avoid water accumulation creating corrosion.
Location: Philippines, Rubicon Intrepid FPSO
Duration: 2 months.
With use of special lightweight epoxy concrete the uneven parts of the deck were filled up to avoid water accumulation creating corrosion.
Location: Philippines, Rubicon Intrepid FPSO
Duration: 2 months.
SINGAPORE
G.O.S PTE.LTD.
90 Eu Tong Sen Street,
#03-02B CIDC Building
Singapore 059811
Tel: +65 96797957
Company No.: 201130847E
INDONESIA
PT GOS SOLUTIONS INDONESIA
Kompleks The Central Business
Blok A1 #1,
Central Sukajadi
Batam 29463
Tel: +62 778 4089222
Company No.: 14648.2015
MYANMAR
GOS MYANMAR CO. LTD.
Excel Tower, Rm 206,
520 Kabar Aye Pagoda Road,
Shwe Gone Daing, Bahan Township,
Yangon
Tel: +63 995 103 0701
E. [email protected]
Company No.: 1127FC
THAILAND
G.O.S. CO., LTD.
No.283/39,41, Homeplace Office
Building, 8 Floor,
Soi Sukhumvit 55 (Thonglor13),
Khlong Tan Nuea,
Watthana, Bangkok.10110
Tel: +66 65 991 0600
E. [email protected]
Tax ID – 0105566150542
© GOS PTE LTD, SINGAPORE 2024