Client requested if it was possible to coat the 900 mm inlet pump housing. Housing was worn inside in several places. With Metaline we build up to original thickness and at the same time providing a erosion/cavitation resistant layer of high durability. Our partner Maagd Industrial Engineering (Metaline Netherlands) completed the job in Holland.
Location : Netherlands
Duration 2 weeks.